The 3DEXPERIENCE Roles

Explore the Roles that bring seamless industry-wide collaboration, secure data storage and sharing, convenient 3D modeling, and more to your 3D design and manufacturing journey. 

Governance & Collaboration 

Collaborative Business & Industry Innovator

On cloud / On-premises / Collaboration & Intelligence 

 

A combination of the Business Innovation and Industry Innovation roles. 

 

    • Connect everyone to the innovation process. 
    • 3DDashboard delivers the real-time intelligence needed to monitor everything that matters to a business so you can make data-driven decisions. 
    • Share files securely on the cloud. 
    • Instantly collaborate and share ideas in 3D. 
    • Secure access to all product content. 
    • Collaborative IP management enables collaboration with shared content. 
    • Navigate data on any product development. 
    • Immersive business intelligence (B.I. Essentials) highlights KPIs directly on the 3D product view. 

Collaborative Business Innovator

On cloud / On-premises / Collaboration & Intelligence 

 

Powered by 3DEXPERIENCE social services. Unite employees, suppliers, customers, consumers, and regulators into the framework for sustainable innovation. 

 

    • Innovate with more confidence by engaging consumers and customers early in the ideation process. 
    • Easily access and consider valuable feedback from across the value stream. 
    • Make the best-informed decisions, considering all data across your enterprise not just data at hand or outdated reports. 
    • Improve productivity by sharing easily across your value stream. Spend less time updating data and managing status. 
charlesdeluvio-Lks7vei-eAg-unsplash

Collaborative Designer for SOLIDWORKS 

On cloud / On-premises / Virtual Product Development

 

Optimize design work with tasks, issues, and change management integrated in SOLIDWORKS. 

 

    • Achieve real-time, safe concurrent design across distributed teams. 
    • Collaborate with all stakeholders in your company on multidiscipline and multi-CAD product definitions. 
    • Share SOLIDWORKS designs with your extended enterprise using web-based technologies, available on any device at any time. 
    • Enable downstream usage of the 3DEXPERIENCE portfolio of applications. 

Collaborative Designer for Draftsight 

On cloud / On-premises / 3DEXPERIENCE WORKS 

 

Access the 3DEXPERIENCE cloud-based platform from within your DraftSight application for secure data and product lifecycle management. Shorten time to market with secure collaboration across disciplines and distributed design teams working with a centralized product repository in DraftSight. 

 

  • Manage drawing data with the seamless and integrated product lifecycle management. 
  • Search, explore, and perform lifecycle operations including revise, release and lock/unlock. 
  • Directly access 3DEXPERIENCE applications and information from DraftSight. 

Collaborative Industry Innovator 

On cloud / On-premises / Collaboration & Intelligence 

 

Reduce product development cycle times and maximize innovation across your value network. 

 

  • Collaborate on structured industrial product development processes. 
  • Work more effectively with streamlined and secured content access. 
  • Enable real-time concurrent collaboration, enhance decision-making, and reach design maturity faster. 
  • Always work with up-to-date information and related data to reduce errors. 
  • Intuitively organize, view, and track individual and shared issues, tasks, and change actions from creation through completion. 
  • Access content anywhere on any device with browser-based 3D visualization and geometric analysis tools for 3D comparison, measurements, and sectioning. 

Project Planner 

On cloud / On-premises / Collaboration & Intelligence 

 

Planning for all, reduce resource and overall project execution costs with lean optimized team planning. 

 

  • Experience mobile, inclusive, and easy-to-use tools for any user to plan their work and contribute to the team plan. 
  • Benefit from collaborative planning in real time. 
  • Real-time project execution KPI’s are available to all collaborators. 
  • Get access to a built-in Schedule Optimizer. 
  • Automatically optimize project plans based on user updates and changes. 
  • Immersive and seamless, you can integrate your unique tasks. 
  • Assign tasks and associate deliverables, available directly from within your CAD application. 

Product Release Engineer 

On cloud / On-premises / Virtual Product Development 

 

Reduce the lead-time to complete and validate your product Engineering Definition. 

 

  • Improve productivity through smart data organization. 
  • Categorize IP & navigate on your Engineering Definition, leveraging category filtering capabilities to facilitate data access. 
  • Foster multi-discipline collaboration and work more effectively. 
  • Manage your Engineering Definition with flexible visualization, mass edition, and lifecycle operations. 
  • Drive company part numbering convention adoption. 
  • Accelerate cross-team collaboration and product development by assigning engineering responsibility across your value network. 
  • Maximize carry over with an efficiently configured Engineering Definition. 

3D Design & Engineering

3dx

3DEXPERIENCE SOLIDWORKS Standard 

On cloud / 3DEXPERIENCE Works 

 

The easy-to-use, robust, mechanical design solution for everyone, 3DEXPERIENCE SOLIDWORKS Standard is for designers and engineers who want an intuitive set of 3D designs to power their innovation. 

 

  • Create complex 3D models and production-ready 2D drawings. 
  • Tackle industry specific workflows for sheet metal, weldments, molds, plastic components, and tooling and dies. 
  • Verify fit and function before heading to production. 
  • Manage basic product lifecycle aspects directly within your design application. 

3DEXPERIENCE SOLIDWORKS Professional 

On cloud / 3DEXPERIENCE Works 

 

Design better products faster with the advanced productivity and rendering capabilities of 3DEXPERIENCE SOLIDWORKS Professional. 3DEXPERIENCE SOLIDWORKS Professional builds on the capabilities of 3DEXPERIENCE SOLIDWORKS Standard to speed up your time-to-market.   

 

  • Analyze designs based on manufacturing cost estimation. 
  • Check for design errors and detect any interference to eliminate manufacturing rework. 
  • Quickly assess the manufacturability of your designs with dimension and tolerance analyses. 
  • Reverse engineer from scanned mesh models. 
  • Create photorealistic images and animations of your designs for marketing. 
3dx
3dx

3DEXPERIENCE SOLIDWORKS Premium  

On cloud / 3DEXPERIENCE Works 

 

Grow beyond mechanical design to multi-domain product development with the industry proven capabilities of 3DEXPERIENCE SOLIDWORKS Premium. 3DEXPERIENCE SOLIDWORKS Premium builds on the capabilities of 3DEXPERIENCE SOLIDWORKS Professional with advanced surface flattening and electrical cable and piping routing functionalities to tackle design challenges across a wide range of industries.  

 

  • Streamline your piping and tubing system design with drag-and-drop placement, automatic sizing of components, and auto-insertion of piping bends and elbows. 
  • Design electrical cabling systems and harness routes. 
  • Create engineering drawings with complete bills of materials (BOMs), cut lengths, and harness manufacturing documentation. 
  • Route rectangular or round sections. 
  • Determine the initial blank size of textile and metal components using advanced surface flattening capabilities to save time, material, and costly redesign work. 

3DEXPERIENCE Draftsight Professional 

On cloud / 3DEXPERIENCE Works 

3DEXPERIENCE DraftSight Professional enables you to create and edit professional-grade DWG drawings within a familiar 2D drafting environment.  

 

  • Get up to speed quickly with a familiar and streamlined user interface. 
  • Migrate easily from other 2D CAD applications thanks to a familiar interface, workflows, and support for your existing DWG data and automation. 
  • Create, edit, view, share and print professional drawings for engineering, construction, and manufacturing. 
  • Leverage the 3DEXPERIENCE platform for secure collaboration. 
  • Manage 2D DWG data with rich design libraries and productivity tools. 
3dx
3dx

3DEXPERIENCE Draftsight Premium 

On cloud / 3DEXPERIENCE Works 

 

Meet all your drafting, modeling, prototyping, manufacturing, and laser cutting needs with a robust 2D drafting environment. 3DEXPERIENCE DraftSight Premium enables you to create, edit, and manage professional grade DWG drawings within a familiar 2D drafting environment.  

 

  • Get up to speed quickly with a familiar and streamlined user interface. 
  • Migrate easily from other 2D CAD applications thanks to a familiar interface, workflows, and support for your existing DWG data and automations. 
  • Create, edit, view, share, and print professional drawings for engineering, constructions, and manufacturing. 
  • Leverage the 3DEXPERIENCE platform for secure collaboration and data management. 
  • Manage both 2D and 3D DWG data with rich design libraries and productivity tools. 
  • Organize multiple sheets and properties efficiently. 
  • Easily collaborate, manage data, and streamline product lifecycles with intuitive design process tools. 
  • Leverage full premium values like 3D DWG and 2D Constraints, as well as 3DEXPERIENCE platform data management capabilities. 

3D Creator 

On cloud / 3DEXPERIENCE Works 

 

Innovate, collaborate, and create great designs anywhere anytime. 3D Creator combines ease of use with innovative design methodologies and cloud collaboration inside your web browser. 

 

  • Capture and realize your ideas with parametric 3D models of parts and assemblies. 
  • 3D Creator includes the xDesign app equipped with Design Guidance, an interactive simulation and optimization algorithm-based feature to inspire innovative solutions to your design challenges. 
  • Stop worrying about installing, configuring, or managing software. With a cloud-based solution you are always working with the latest version of 3D Creator on all your devices. 
  • Ensure secure communication and collaboration with stakeholders, both internal and external. Ensure successful collaboration within your ecosystem through secure and safe communities, complete design, and file access control, sharing, light weight visualization, and product review. 

3D Sculptor 

On cloud / 3DEXPERIENCE WORKS 

 

Create organic looking shapes and surfaces using subdivision modeling technology anywhere and anytime.  

 

  • 3D Sculptor includes xShape, an easy-to-use and intuitive app which offers all the basic tools and features required to make organic looking shapes using subdivision modeling technology. 
  • Enhanced interoperability allows 3D Sculptor to work with SOLIDWORKS and other CAD authoring apps on the 3DEXPERIENCE platform. 
  • Stop worrying about installing, configuring, or managing software. With a cloud-based solution you are always working with the latest version of 3D Sculptor on all your devices. 
  • Ensure secure communication and collaboration with stakeholders, both internal and external. Ensure successful collaboration within your ecosystem through secure and safe communities, complete design, and file access control, sharing, light weight visualization, and product review

3D SheetMetal Creator 

On cloud / 3DEXPERIENCE WORKS 

 

Create production-ready sheet metal designs in a powerful, intuitive, browser-based solution. 

 

3D SheetMetal Creator provides a focused user experience tailored to the needs of sheet metal designers and engineers, perfect for sheet metal components and enclosures. 

 

  • Create accurate, manufacturing-ready, and detailed sheet metal designs anywhere at any time with no installation necessary. 
  • Validate designs early with instant access to automatically updated flat patterns. 
  • Streamline your design process with an intuitive, intelligent, and dedicated sheet metal user experience. 
  • Automate repetitive tasks with the help of the Design Assistant using machine learning technology. 
v3dx
3dx

3D Structure Creator 

On cloud / 3DEXPERIENCE Works 

 

Design manufacturable structures with 3D Structure Creator, a powerful, intuitive, browser-based solution that provides users with associative feature-based frame design tools for every stage in the design process, from conceptual design to generating manufacturing information. Get access to a parametric structure modeling application that runs completely in your web browser of choice, giving designers the freedom to design on their own terms.  

 

  • Create structure members based on model edges, 2D sketch elements, or curves. 
  • Choose profiles from a library of standard types and sizes. 
  • Automatically trim members at endpoints and corners. 
  • Automatically generate a cut list based on the design to use for manufacturing. 
  • Increase productivity with streamlined structure design workflows and a dedicated design environment. 

Manufacturing Definition Creator 

On cloud / 3DEXPERIENCE Works 

 

Manufacturing Definition Creator combines model-based and drawing-based capabilities in one integrated solution to enable you and your teams to easily define 3D models and quickly produce 2D drawings from them, in a matter of mouse clicks. The combination of 2D and 3D definition capabilities delivers next-generation flexibility, empowering you to choose the best output to meet all your stakeholders’ needs. 

 

  • Intuitively and accurately define design requirements and specifications on your models, reducing discrepancies and ensuring a consistently up-to-date connection between definition and engineering. 
  • Reduce shop floor questions and facilitate the interpretation of product definitions with a series of captured views that provide a curated storyline of design requirements. 
  • Communicate 2D and 3D definition from anywhere on any device with an internet connection. All stakeholders, internal and external, are always up-to-date and can access the latest data at any time. 
  • Easily produce an accurate 2D representation from your existing 3D definitions. 
  • Clearly communicate design specifications with 3D product manufacturing information (PMI) capabilities. 
3dx
3dx

3D Mold Creator 

On cloud / 3DEXPERIENCE Works 

 

Access specialized mold design tools built to speed up your tooling design processes and reduce costs while maintaining high molded part quality, all available in your web browser. 3D Mold Creator provides dedicated mold tooling design functionality for faster, automated, and more robust mold core, cavity, and inserts geometry design. Reduce hardware costs and empower your mold designers to flexibility design and access their data from anywhere at any time. 

 

  • Easily check for draft and undercut issues and make model edits as required. 
  • Compensate for plastic part shrinkage with part scaling. 
  • Automatically determine and create the parting line. 
  • Create inserts to handle undercut geometry. 
  • Automatically create shutoff and parting surfaces. 
  • Automatically split mold tooling into core, cavity, and inserts. 
  • Your mold geometries automatically update with any design model changes, so you’re always working with up-to-date information. 

Simulation

3D Motion Creator 

On cloud / Multibody Dynamics 

 

Access a robust set of motion simulation capabilities, within an intuitive, highly interactive, and tightly integrated motion-to-design environment for a true lifelike experience. 3D Motion Creator provides users with easy-to-use functionality for kinematic and dynamic analysis of any mechanisms, delivering actionable results to enable design teams to verify product range of motions and optimize product design. 

 

  • Quickly define, simulate, and validate multiple mechanical designs earlier in your design processes to drive product innovation.  
  • Rapidly evaluate what-if design scenarios under realistic conditions to reduce costly design and prototyping rework.  
  • Understand the complete impact of product motion with 3D animations and result plots. 
3dx
3dx

Fluid Dynamics Engineer 

On cloud / On-premises 

 

Perform fluid flow and heat transfer simulations, leading to better quality designs while avoiding manufacturing issues. 

 

  • Efficiently explore fluid flow and thermal performance design alternatives to accelerate product innovation. 
  • Leverage full integration with CAD and PLM for concurrent, simulation-driven product development. 
  • Easily predict steady-state and long-transient flow and thermal behavior of products with the designer-centric guided interface. 
  • Collaborate with project stakeholders around fluid flow simulation results for informed decisions. 
  • Include local compute using up to 8 cores with additional compute capacity also available. 

Plastic Injection Engineer 

On cloud / On-premises 

 

Validate and optimize plastic part and mold tooling designs by simulating the filling, packing, warpage, and mold cooling early in the product development process. 

 

  • Virtually test the performance of plastic part and mold tooling designs with an intuitive, guided simulation assistant that minimizes the learning curve. 
  • Cover the needs for all industries, all key workflows, and all user personas with a single role. 
  • Predict common molding defects including weld-lines, sink marks, air traps, and incomplete filling (short shots). 
  • Evaluate the effectiveness of mold cooling system designs. 
  • Apply advanced structural capabilities available in the 3DEXPERIENCE platform, such as non-linear multi-scale material modeling, directly on a common model. 
  • Leverage process automation, design of experiments, and advanced optimization tools. 
3dx
3dx

Structural Designer 

On cloud / On-premises / Structures 

 

Accelerate product design with efficient evaluation of stress, strain, natural frequency, and temperature in a user friendly, guided environment. 

 

  • Intuitively assess the performance of products under linear static conditions and guide the overall design process. 
  • Quickly evaluate the strength and stiffness of components for informed what-if design scenarios. 
  • Use a unique guided workflow process that enables any designer to rapidly determine product performance. 
  • Easily and efficiently test product designs with automated modeling and ability to control accuracy vs compute time. 
  • Include local compute up to 4 cores. 

Structural Engineer 

On cloud / On-premises / Structures 

 

Provide your design engineers with the powerful and intuitive tools they need to perform linear structural simulations during the design process. 

 

  • Test structural performance with a unique guided workflow for linear static, frequency, buckling, steady state thermal, harmonic, and modal dynamic analysis types. 
  • Easily assess large assembly performance with intuitive contact definition and powerful contact detection capability. 
  • Evaluate the structural KPIs of any geometry type with high quality meshing including solid, shell and beam elements with automatic mesh generation. 
  • Enable high performance results visualization, particularly for very large models. 
  • Include local compute up to 4 cores. 
3dx
events

Structural Mechanics Engineer 

On cloud / On-premises / Structures 

 

Benefit from comprehensive structural simulations covering statics, implicit and explicit dynamics, and acoustics across a broad range of industrial applications. 

 

  • Easily perform structural analyses including static or quasi-static, frequency, buckling, mode-based steady-state or transient dynamic, random response, and non-linear dynamic. 
  • Perform thermal analyses or sequential thermal-stress analyses, in either transient or steady states. 
  • Get advanced capabilities from meshing, with possible automated creation, model management, scenario definition, execution (tokens included), results visualization, and report generation. 
  • Embedded tokens for running your analyses up to 8 cores. 

Structural Performance Engineer 

On cloud / On-premises / Structures 

 

Assess the structural performance of products in nonlinear static and dynamic environments to make better-informed engineering and manufacturing decisions. 

 

  • Provide product engineers powerful and intuitive tools needed to perform sophisticated structural simulations during the design process. 
  • Experience efficient what-if scenarios through seamless associativity and integration with geometry. 
  • Take advantage of a unique engineering workflow with access to robust simulation technology within an intuitive interface. 
  • Work with multistep structural scenarios for product performance and quality testing during the product design process. 
  • Accelerate structural performance simulation with unique automated model creation for large assemblies. 
  • Enable high performance results visualization, particularly for very large models. 
  • Include local compute up to 4 cores. 
3dx
3dx

Product and Packaging Analysis Engineer 

On cloud / On-premises / Structures 

 

Perform detailed simulations on different product and packaging designs to accelerate performance/cost trade-offs and reduce time to market. 

 

  • Simulate how a new package design will behave at every stage of its lifecycle. 
  • Ensure your packaging delivers the desired consumer experience that drives your consumers to place your product in their shopping cart. 
  • Reduce development lead-time cost and improve quality and reliability. 
  • Detect and resolve problems early in the design process. 
  • Capture and share simulation IP for fast collaborative decisions. 

Simulation Model Build Engineer 

On cloud / On-premises / Simulation 

 

Provide the detailed essential mesh and assembly modeling needed to reduce non-value-added tasks and build solver-ready finite element models quickly and efficiently. 

 

  • Provide structures modelling and assembly for T&M, A&D, and other strategic industry process experiences. 
  • Fully automate mid-surface extraction, mesh generation, and mesh re-generation. 
  • Manage subassemblies and utilize automated assembly connections modeling. 
  • Generate abstraction shapes for simulation associated to original design geometry. 
  • Perform collaborative model management for building and sharing models particularly suited for large assemblies. 
3dx
3dx

Product and Packaging Analysis Engineer 

On cloud / On-premises / Structures 

 

Assess the structural performance and durability of your products during the design process, before committing to expensive prototyping or manufacturing. Powered by Abaqus technology, intuitively guide your design decisions by leveraging all the tools you need to perform sophisticated multistep structural simulations. 

 

  • Use fatigue simulation to predict accurate fatigue lives and ensure complex engineering products are designed for durability. 
  • Avoid late re-design, minimize physical tests, reduce warranty costs, and extend life in service. 
  • Experience comprehensive what-if scenarios through seamless geometry associativity. 
  • Leverage multistep structural scenarios for product performance and quality testing during the product design process. 
  • Accelerate structural performance simulation with unique automated model creation for large assemblies. 
  • Enable high performance result visualization, particularly for very large models. 

Manufacturing & Operations

Lean Team Player 

On cloud / Collaborative Operations 

 

Guide team engagement and improve performance with DELMIA 3DLean. 

 

  • Engage teams despite physical or organizational barriers. 
  • Structure meetings to guide problem-solving and manage actions. 
  • Visualize 3D content and data. 
  • Empower teams to work autonomously. 
  • Make ‘Lean Thinking’ a standard part of business, teams, and culture. 
3dx
3dx

Machine & Tooling Designer 

On cloud / On-premises / Industrial Engineering 

 

Easily, quickly, and efficiently create any type of mechanical device along with its kinematics. 

 

  • Create all the mechanical devices used in a manufacturing setting, from simple clamps to NC machine tools and 3D printers. 
  • Enable programmers to define, optimize, and validate their programs. 
  • Validate and optimize mechanical equipment designs to mitigate costly errors and accelerate start of production. 

Manufactured Part Process Engineer 

On cloud / On-premises / Industrial Engineering 

 

Define and validate your fabrication process in a user-friendly 3D virtual environment and consume and track all specification inputs. 

 

  • Accelerate the start of production and improve first-time quality and effortlessly deliver all necessary information for shop floor execution. 
  • Increase your business’s manufacturing agility and reduce your time-to-market by defining and validating assembly processes virtually, before start of production. 
  • Leverage the power of model-based planning to improve the speed and accuracy of incorporating engineering and manufacturing changes to assembly lines. 
events
events

NC Machine Simulation Engineer 

On cloud / On-premises / Industrial Engineering 

 

Leverage full NC program validation based on NC Code (ISO Code/ G-Code) machine simulation for milling, turning, and riveting. 

 

  • A complete milling solution for complex parts that includes cycles dedicated to hard material strategies specifically designed to reduce machining time. 
  • Achieve digital continuity between your designers, process planners, and NC programmers. 
  • Securely and confidently share up-to-date data across in a single environment. 

NC Milling Machine Programmer 

On cloud / On-premises / Industrial Engineering 

 

Enable efficient creation and validation machining processes to program NC lathe and mill-turn machines. 

 

  • A complete milling solution for complex parts that includes cycles dedicated to hard material strategies specifically designed to reduce machining time. 
  • Increase collaboration between designers & NC programmers to improve engineering efficiency. 
  • Validate NC programs in 3D to detect and prevent possible machining errors. 
events
events

Process Engineer 

On cloud / On-premises / Industrial Engineering 

 

Create balanced process plans and optimize your workload balancing. 

 

  • Optimize workload balancing. 
  • Ensure balanced process plans. 

Production Engineer 

On cloud / Manufacturing & Production 

 

Control your bill of manufacture throughout your product’s lifecycle across multiple production routing processes. 

 

  • Create, clone, and edit bills of manufacture and routing data with full control. 
  • Collaborate with teams and customers on product variations. 
  • Leverage existing item costs and provide the opportunity to add other costing elements like labor, overhead, and start-up to generate an accurate costed bill of manufacture. 
  • Communicate and enforce best practices with setup checklists and user-defined forms. 
  • Gain full control over the lifecycle of your bill of manufacture documents from creation to obsolescence. 
3dx

    Register / Download



    [contact-form-7 404 "Not Found"]